skip to main | skip to sidebar
Charles Eller Mexico Studio Blog

Thursday, April 9, 2009

View from back of property near studio to front gate and casita


(click to enlarge)
Posted by Charles Eller Studios Home Page at 10:58 AM

No comments:

Post a Comment

Newer Post Home
Subscribe to: Post Comments (Atom)

Return To Home Page

Charles Eller Studios

Blog Archive

  • ►  2011 (12)
    • ►  May (12)
  • ▼  2009 (11)
    • ▼  April (11)
      • One of the locals.........
      • The construction materials begin arriving
      • The steel beams arrive......
      • The "maestros" at work on the drum booth stone wall
      • Drum booth stone wall in progress....
      • The cutting of one of the two arched doorways
      • The first arched doorway is starting to take shape!
      • The massive wrought-iron doors going in. The doors...
      • My builder "Rodo" inspecting more materials arrivi...
      • My buddy "Cuchin" prepping the steel roof beams
      • View from back of property near studio to front ga...